The time required for a proper installation process will vary based on the size of your structure, additional customizations and the weather conditions in the area. For smaller, standard buildings it can take just a few hours for assembly. On the other hand, larger structures may take a few days to be fully assembled.
There are a few site preparations you’ll need to complete in order for your structure to be installed properly. These steps include choosing an install site that offers enough space for your structure and any additional modifications, clearing it of all debris, vegetation and blockages and having it leveled. It will also need to be accessible for our professional assembly crews.
Prefab steel buildings are specifically designed and engineered to fulfill a variety of residential, agricultural and commercial applications. They’re also built to last for decades to come, providing you with a solution for as long as you need.
All building projects are unique; some of them may require a permit while others do not. You’ll need to check with your local zoning office and building department to see if there are certain permits you’ll need to obtain in order to have a structure installed on your property. This will depend on the county you live in and their building codes.
Every aspect of our steel buildings is fully customizable, from the foundation they’re installed on, to the roof that tops it off, to the color combination of your roof, trim and walls. A few of our various customization options include standard size dimensions, windows, doors, additional pieces of paneling, colors and many more.
A certified structure is one that is specifically designed to meet and exceed local wind and snow loads as well as local building codes. While any metal building can be certified, it’s highly recommended for installation areas prone to extreme weather conditions such as high winds and heavy snowfall.
While the average lead time ranges from 4 to 6 weeks, this time frame can change based on the size of your building project, your installation location and its weather conditions. For an up-to-date lead time, you can contact the manufacturer in charge of your order.
Yes, we offer steel building kits for all our structure styles. These kits are offered for a lower price; however, it is your responsibility as the customer to have them installed properly.